FRA02

Greater Frankfurt area, Germany

Key stats

Status
Under construction
IT Power
54 MW
Power capacity secured
100 MVA
On-site substation
110 kV – 20 kV
Compliant design
Tier 3
Redundant high voltage connection
Up to 100 MVA

Project overview

Redevelopment of the former printing plant of German newspaper Frankfurter Rundschau into a state-of-the-art data centre south of Frankfurt.

Strategic location

Germany is Europe’s largest economy, while Frankfurt as home to one of the world’s biggest internet exchange points, DE-CIX, is the most sought-after data centre market in Continental Europe.

The regional economy of Frankfurt and the Rhein-Main-region is driven by various industries, such as finance sector, as well as industries such as logistics and transport, technology, creative and cultural, healthcare, chemicals, pharmaceuticals and biotechnology.

Connectivity, power and low risk for data centre operations
  • 100 MVA power capacity secured
  • Direct connection to fiber network available at the plot
  • International Tier 1 fibre carriers such as EuNEtworks, Colt and Gasline in close proximity
  • Low risk profile location outside of flooding and earthquake zones, as well as flight corridors from Frankfurt airport
  • No hazardous uses, high-risk industrial businesses or gas stations located in the immediate neighbourhood
Technical specifications
  • 54 MW IT
  • On-site high voltage substation (110kV – 20kV)
  • Up to 100 MW redundant high voltage connection
  • Tier 3 compliant design
  • 2 tons floor load per sqm
  • Clear height 5.8 m
  • Entrance with rejection scheme
Sustainability

We want our data centres to stand the test of time while minimising their environmental impact. Beyond transforming a brownfield site, FRA02 will be a GreenSpace+ property, including the following sustainability features:

  • Green building certification foreseen (LEED platinum targeted)
  • Waste heat recovery
  • High-quality outdoor facilities to support employee wellbeing
  • EV parking
  • Green roofs and PV installation on office buildings and ancillary buildings
  • Green façade
  • Design includes efficient and state-of-the-art technical installations, including waterless cooling, resulting in a low PuE lowering electrical consumption.

Project Timeline

  • Completed:

    Land acquisition

    Q4 2022

  • Completed:

    Demolition start

    Q4 2023

  • Completed:

    Permit obtention

    Q4 2024

Timeline collapsed
  • Upcoming:

    Powered Shell ready

    H2 2028 bld B; H1 2029 bld A; H2 2029 bld A expansion

  • Upcoming:

    1st RFS (ready for service)

    H2 2028

strategic location

Strategically located in Neu-Isenburg, FRA02 benefits from strong existing infrastructure and connectivity. It is less than 10km from the main internet exchange point DE-CIX in Hanauer Landstrasse and a 10-minute drive from the city’s airport.

the goodman difference

INFRASTRUCTURE FOR THE DIGITAL ECONOMY

As providers of essential infrastructure for the digital economy, Goodman has been developing its data centre capability since 2005. Since then, we have grown to become a large owner of powered sites globally.
Night-time aerial view of a completed data centre facility within Goodman Business Park, showing illuminated façades and surrounding infrastructure.
Tokyo - Goodman Business Park

We have been developing our data centre capability since 2005

Since then, we have built a global portfolio of powered sites in 17 major cities. Our approach is strategic and long term, designed to meet the needs of cloud computing and low latency AI delivered by data centre developers, operating at scale.

6.6GW

total power bank

17

major global cities

FAQs

What capacity is available at FRA02?
FRA02 delivers up to 54 MW of critical IT capacity across a scalable, campus-style development. The scheme is designed to support large, single-tenant or phased deployments in a core European data centre market. 

Capacity remains available — contact Goodman's data centre solutions team to secure allocation and discuss deployment timing. 
How is water managed?

Water strategy is embedded in site design through: 

  • Rainwater infiltration systems 
  • Reduced paving to limit heat and runoff 
  • Vegetation and green infrastructure 

This supports efficient drainage and responsible water usage at site level. 


How can I get more information or discuss a deployment?
For further information on availability, deployment options or technical requirements, please contact Goodman's data centre solutions team to discuss your project. 
Where is FRA02 located?
FRA02 is located in Neu-Isenburg (Frankfurt/Main region, Germany) — one of Europe's most established data centre markets. 
Why this location?

FRA02 sits within the Frankfurt East Cluster, approximately 9 km from DE-CIX, Europe's largest internet exchange. This enables: 

  • Low-latency access to key interconnection hubs • 
  • Immediate integration into Frankfurt's dense fibre ecosystem
  • Access to established network infrastructure and ecosystem depth 

Combined with proximity to Frankfurt Airport and the city centre, FRA02 offers a highly connected, infrastructure-secured deployment location. 


What power infrastructure supports the site?

FRA02 is built for large-scale, high-demand workloads with: 

  • 54 MW critical IT load 
  • 100 MVA secured utility power on redundant high-voltage grid connection 
  • On-site high-voltage substation (110 kV–20 kV) 

This setup ensures secure, scalable and long-term power availability in a constrained market. 


How resilient is the infrastructure?
FRA02 is designed to a Tier III-compliant standard, delivering high availability and operational continuity. 

Electrical systems are configured with 5+1 redundancy, supporting mission-critical workloads and minimising downtime risk. 
What connectivity options are available?

FRA02 is a carrier-neutral facility with: 

  • 6+ on-net fibre providers 
  • Access to international Tier 1 carriers including euNetworks, Colt and GasLINE 
  • Direct integration into the Frankfurt metro fibre network 

This enables diverse, resilient network architectures tailored to hyperscale and colocation requirements. 


How is the campus designed?

The FRA02 campus spans approximately 50,000 sqm and is structured to support modular, phased delivery. 

  • Two buildings (27 MW IT each) 
  • Multiple data halls per building 
  • Dedicated support infrastructure and secure site layout 

The design enables flexible deployment strategies with room for scale within a single campus environment. 


Who is FRA02 designed for?

FRA02 is purpose-built for: 

  • Hyperscale cloud providers 
  • Large-scale enterprise 
  • Neoclouds and HPC workloads 

The combination of scale, power security and connectivity supports high-availability cloud and digital infrastructure deployments in a Tier 1 market. 


What is the sustainability approach?

FRA02 integrates environmental considerations into its core design, including: 

  • Water-efficient cooling strategy 
  • Waste heat recovery
  • Green roofs, façades and landscaped buffering
  • PV installations and EV infrastructure
  • GreenSpace+ design approach with certification targets 

These measures are designed to reduce environmental impact while supporting long-term operational efficiency. 


GET IN TOUCH

Matthieu Wieczorek

Matthieu Wieczorek

Data Centre Development CE

Jonas Ramspott

Jonas Ramspott

Business Development

Call

Provide your contact information and our property team will be in touch.
By submitting your enquiry below you agree to the Privacy Policy